Our Business Services

Sunaz Steel & construction services are complete project management, Design, Fabrication, Supply, and Erection for Pre-Engineered Steel Buildings & related civil works.

Quality of works

Sunaz Steel & construction’s house design team is equipped with a separate Quality Department with functions at the factory dedicated to undertaking quality checks at every level of the material entry to delivery to the site. This quality check is carried out throughout fabrication until completion of painting thus ensuring that only materials that qualify the stringent quality tests of Sunaz Steel & construction Quality Department are delivered to the client.

Fabrication & Supply

Our fabrication is guaranteed right through cutting, fitting, welding, shot blasting, and painting using the best machines available in the PEB industry of Bangladesh. To ensure delivery of the best quality product, the process commences right from the beginning i.e. material used.  All materials are imported from a variety of sources from Japan, Korea, China, Vietnam, Australia, etc.  The imported plates are subjected to quality tests before fabrication under the supervision of the QC Department of Sunaz Steel & construction at the Factory end.

Erection

A very compact team with Project Engineers, Site Engineers, Supervisors and Senior Workers comprises the Sunaz steel & construction Erection Team. All the raw materials for the production of the building are imported from USA, Europe, Australia, Taiwan, China, Malaysia and some other countries.

Design

Sunaz steel & construction has an in-house design department that is led by a highly professional designer supported with a number of other designers and detailers. The design and engineering department is equipped with the latest design and detailing software along with the relevant books on building codes related to steel building (BNBC 2022, AISC 2005, AWS 2006, MBMA 2006, AWS 2007).

One Stop Solution 

1.

Client Requirement Discuss with Marketing Team

4.

Marketing Team Submitted Design for Client Approval

7.

Design Team Handover the detailed design to the Production Team

10.

The erection Team Erects the Total Infrastructure and Makes QC as Per the Design

2.

Marketing Team Approach Requirement to Design Team

5.

Design Approve by Client

8.

Production

11.

Handover The Project to the Client

3.

The Design Team Makes the Design and Handover to the Marketing Team.

6.

After Client Approval of the Design Marketing Team Handover, it is for Detail Design To the Design Team

9.

Production Team Handover Total Production and Design to Erection Team